The system of inconsistency detection & resolving based on priorities
The inconsistencies system characteristics:
-
works based on constraints priorities - a user can define priorities for constraints entered. If the system detects an inconsistency between some constraints, it will remove less important constraints.
-
automatic continuation of the execution after detection of inconsistencies and removing less important ones - a user is not forced to remove them manually. The constraints are still in the system and could be corrected manually if needed.
-
using the data from a preceding run to auto-apply corrections found even after some modifications done to a timetable - this helps to speed up the starting time of the generation process.
Already 4035 users registered in the portal.
You are invited to check the service for FREE.
To make your own timetable - login
|